99久久亚洲综合精品成人,人妻少妇久久中文字幕一区二区,国产嫖妓一区二区三区无码,国产精品夜色一区二区三区

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
国产成熟妇女性视频电影| 人妻大战黑人白浆狂泄| 亚洲男人的天堂av手机在线观看| 99er国产这里只有精品视频免费| 亚洲爆乳精品无码一区二区| 在线亚洲综合欧美网站首页| 国产99久9在线视频传媒| 久久久国产精华液| 国产亚洲曝欧美曝妖精品| 国产午夜福利片| 国产精品黄页免费高清在线观看 | 精品 在线 视频 亚洲| 色八戒一区二区三区四区| 红桃av一区二区三区在线无码av| 精品国产一区二区三区吸毒 | 国产精品亚洲αv天堂| 久久久国产精品无码一区二区| 2012中文字幕在线视频| 国产 精品 丝袜| 亚洲不卡av不卡一区二区| 欧美亚洲国产一区二区三区| 国产欧美日韩a片免费软件| 免费观看性行为视频的网站| 国产高潮刺激叫喊视频| 欧美丰满老妇性猛交| 蜜桃mv在线播放免费观看视频| 国产在线精品一品二区| 日韩精品无码一区二区中文字幕| 国产精品久久久久av| 久久亚洲精品情侣| 亚洲欧美成人精品香蕉网| 成年美女黄网站18禁免费 | 一区二区三区在线 | 日本| 国产精品毛片va一区二区三区| 亚洲gv天堂无码男同在线观看| 国产香蕉97碰碰视频va碰碰看| 亚洲肥老太bbw中国熟女| 99国产精品久久久久久久日本竹 | 人妻与老人中文字幕| 中文字幕乱码亚洲无线码| 人妻去按摩店被黑人按中出|